SUPPLY & CONSTRUCTION OF 132KV TRANSMISSION OVERHEAD LINE FROM LUSAKA SOUTH MULTI-FACILITY ECONOMIC ZONE TO CHAWAMA SUBSTATION & FROM CHAMAMA TO CHILANGA SUBSTATION


PERIOD: 2019-ON GOING

MAIN CONTRACTOR: ELSEWEDY ELECTRIC T& D (www.elsewedyelectric.com)




DESCRIPTION OF CIVIL WORKS:



  • Bush clearing of way leave 28km
  • Excavation of foundation pits for Monopole towers
  • Drilling & blasting in rock foundation
  • Levelling & compacting of foundation pits
  • Steel fixing for strain foundation monopole towers (base  & pedestal)
  • Placing & setting of down holding bolts and top plate/base plate
  • Form Work with Steel Shutters
  • Premixed Concrete Casting

   

STEEL FIXING & DOWN HOLDING BOLTS/TEMPLATE SETTINGS

ELECTRO-MECHANICAL WORKS

                                                                        DESCRIPTION OF ELECTRO-MECHANICAL WORKS:

  • Erection of intermediate & strainer monopole towers
  • Installation of 132kv hardware & accessories to the monopoles
  • Stringing of 132kv single & double circuit  for 30km



 